Skip to content

Bump github.com/moby/spdystream from 0.5.0 to 0.5.1

054f7da
Select commit
Loading
Failed to load commit list.
Merged

Bump github.com/moby/spdystream from 0.5.0 to 0.5.1 #1244

Bump github.com/moby/spdystream from 0.5.0 to 0.5.1
054f7da
Select commit
Loading
Failed to load commit list.
Red Hat Konflux / Red Hat Konflux / netobserv-ystream-enterprise-contract / pr group succeeded Apr 16, 2026 in 41s

Succeeded

Integration test for pr group snapshot netobserv-ystream-20260416-205702-480 and scenario netobserv-ystream-enterprise-contract has passed

Details


Task Duration Test Suite Status Details Note
collect-keyless-params 9s ✔️ Reason: Succeeded ✔️ Reason: Succeeded
verify 30s ✔️ SUCCESS ✔️ 242 success(es)

The group snapshot is generated for pr group dependabot/go_modules/github.com/moby/spdystream-0.5.1 and the component snasphots as below:

Component Snapshot BuildPipelineRun PullRequest
netobserv-ebpf-agent-ystream netobserv-ystream-20260416-205046-000 netobserv-ebpf-agent-ystream-on-pull-request-8g6kn netobserv-ebpf-agent
network-observability-cli-ystream netobserv-ystream-20260416-205044-000 network-observability-cli-ystream-on-pull-request-ghstv netobserv-cli
flowlogs-pipeline-ystream netobserv-ystream-20260416-205039-000 flowlogs-pipeline-ystream-on-pull-request-t4wwk flowlogs-pipeline