Checklist item: B47-b — scope + DoD per workspace CHECKLIST.md (source of truth; never enters the repo)
Milestone: Design track
Criteria: criteria:DF
Blocked by: —
The Big Idea
Draw the eight missing control-state sets (hover/focus/disabled/error… across control types).
Details
§20 deliverable 2. Eight of eleven controls have no drawn states today; each gets the full state matrix so B29 builds from drawings, not guesses.
Source: CHECKLIST.md, item B47-b.
Recommend tests
- All eight sets complete; contrast verified per surface rule (FLOOR family).
- Health check CLEAN.
Potential code references, but use your judgement
- None yet — greenfield within the new
docs/ tree; add references as the area takes shape.
Definition of Done
Checklist item: B47-b — scope + DoD per workspace CHECKLIST.md (source of truth; never enters the repo)
Milestone: Design track
Criteria:
criteria:DFBlocked by: —
The Big Idea
Draw the eight missing control-state sets (hover/focus/disabled/error… across control types).
Details
§20 deliverable 2. Eight of eleven controls have no drawn states today; each gets the full state matrix so B29 builds from drawings, not guesses.
Source: CHECKLIST.md, item B47-b.
Recommend tests
Potential code references, but use your judgement
docs/tree; add references as the area takes shape.Definition of Done
prettier/fourmolu)tsc --noEmit·eslint·hlint), no new warnings