You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
jinyun1tang edited this page Nov 1, 2018
·
1 revision
Soil file change
The following is from the Zelalem.
When using the most recent code from the repo, the old soil file (which runs with code dates back to 2016 December) should be modified as
Change in soil file format in the new SC:
You should change the first row of your soil file:
E.g.
old soil: -0.033,-1.5,0.2,5.33,400,10,1,0,0,0,0,0,0,3,1,1,(11,1,10) note:11 is number of soil layers
to
new soil: -0.033,-1.5,0.2,5.33,400,10,1,0,0,0,0,0,0,3,1,1,(11,0,1,0)
The number of canopy layers (the last digit in the old soil) is not an input anymore (has been hardwired as a parameter)